Renovation apartment Knokke

Knokke

We were entrusted with this assignment and allow you a glimpse into the timely finished apartment.

Completion foreseen for end of March 2023 (planning made in October 2022).

Work only started in January 2023 but thanks to our daily follow-up and our professionals, right on time!

Site was ready Easter 2023

Less than 7 days/space !

Renovation works carried out.

  • works started with skilful fencing of all common parts and passages
  • enlarge rooms and place new layouts whereby all waste was sorted
  • installing a new kitchen and a new bathroom in other locations
  • Installation of new lighting (all LED lights)
  • Parquet refreshment
  • Removing all ceilings and flooring
  • new aluminium exterior joinery professionally delivered and installed including all necessary interior and exterior finishes (and protections)
  • Existing doors with door frames were replaced with block-frame doors and new wrought-iron entrance door to the living room
  • renew all technical appliances adapted to 2023 standards (heating and sanitary appliances)
  • energy-efficient adaptations incorporated in the finishes
  • innovative painting techniques where we attached importance to the wishes and colour combinations imposed by the interior designer with the necessary preliminary test areas
  • Customised furniture

“Renovating is always a challenge, a stressful journey with a lot of decisions to be made. Thankfully we were able to rely on our professional contractor, who listened to our wishes and guided us through the building process. Thanks to years of experience our renovation happened efficient, fast and smoothly.”

- Project Knokke -
Dreaming of a fast and smart renovation?
Seven Days. That’s all you need!